Edhat
 

San Luis Obispo Weather: 59.9°F | Humidity: 99% | Pressure: 30.05in (Steady) | Conditions: Clear | Wind Direction: West | Wind Speed: 0.0mph [forecast]

Free Newsletter
Advertise
    Send the last good SLO picture you took to slo@edhat.com login  twitter  facebook  RSS 
 
 
 

 
Advertise on Edhat
Advertise on Edhat
 
News Events Referrals Deals Classifieds Comments About

more articles like this

Hwy 101 Arroyo Grande Bridge Repair
updated: Feb 12, 2013, 11:36 AM

Source: Caltrans

HIGHWAY 101 BRIDGE REPAIR CONTINUES IN ARROYO GRANDE THIS WEEK SAN LUIS OBISPO COUNTY -

A project to repair and repave a 9-mile section of Hwy. 101 from the Los Berros Road Undercrossing to the Pismo Creek Bridge is continuing with bridge repair during overnight hours Sunday night through Friday morning from 8 pm to 6 am for the next two months.

The bridge rails along northbound Hwy. 101 at Bridge Street, Arroyo Grande Creek and Brisco Road are currently being replaced. This road work includes the use of a hydraulic ram and drilling equipment which can result in a noisy condition for nearby residents. The road work at these locations should be completed within the next two weeks.

The contractor for this $6.7 million project is Cal Portland Construction of Santa Maria, CA. It is expected to be completed this summer.

Caltrans reminds motorists to move over and slow down when driving through highway construction zones.

For traffic updates on other state highways in San Luis Obispo County, motorists can call Caltrans District 5 Public Affairs at (805) 549-3318 or visit the District 5 website at: http://www.dot.ca.gov/dist05/road_information.htm

 

Be the first to comment on this article.

  See more articles like this

# # # #

 

Send this article to a friend
Your Email  
Friend's Email  


[ easy-to-print version of this page ]

 

 

  Home Subscribe FAQ Jobs Contact copyright © 2003-2011  
Edhat, Inc.